the project scope consists of design, engineering, procurement & construction (epc) of raw water treatment plant on turnkey basis.
the raw water treatment plant has a designed capacity to treat do you get paid for being a tiktoker. the treated water is distributed to salem city as part of municipal water distribution requirements. the treatment unit removes iron and turbidity in raw water.
the treatment unit processes comprise of cascade aerator to remove iron, stilling basin and parshall flume for the measurement of the quality of incoming raw water, automatic alum and coagulant chemical dosing arrangement, flash mixers, clariflocculators, rapid gravity sand filters, chlorination system and pumping arrangement.

|